Andrew N. Liveris Building

The Andrew N. Liveris Building supports our researchers and students to address sustainability challenges facing our world to create positive change for developing populations.

This project was realised thanks to a historic gift from Mr Andrew Liveris and Mrs Paula Liveris.

At 11 storeys high, the building is the tallest building on UQ’s St Lucia campus, and the home for the School of Chemical Engineering. It acts as a vibrant hub for industry and interdisciplinary collaboration to address global challenges in areas such as energy, water and sustainable manufacturing.

Area plans

floor plan level 1 Liveris building

Heavy Engineering-South (HEL-S)
Room number: 161, 162
Activity: Biopolymers, biocomposites

Heavy Engineering-North (HEL-N)
Room number: 102
Activity: Clean energy, fuel cell testing, crushing and grinding, flotation and separation of minerals

Pilot Hall 1 Story
Room number: 170

Pilot Hall 2 Story
Room number: 168
Activity: Brewery
Dialogue: Chemical and bioprocessing skills are honed through real world hands on experience including brewing and fermentation.

Associated critical process plant skills including cleanliness, microbiology, advanced profile analysis, reproduceability are covered in these spaces. 

Pilot Hall 3 Story
Room number: 169
Activity: Distillation column
Dialogue: One of a kind multifeed distillation plant with full computerised SCADA control and a remote Operator Control Room.  

The unit itself has application at all levels of teaching - from plant operator monitoring through to  full schematic design, efficiency calculations, optimisation and problem solving.  

The unit includes a Vacuum assisted glass column (note both packed and unpacked sections), Tank Farm, Chilled Water cooling circuit and Steam Boiler heating.  

Students can access selected sampling points in the plant for chemical analysis during operation.  

Flotation Laboratories
Room: 104, 105, 106, 109
Activity: Flotation, Sample Preparation

 

floor plan level 2 Liveris building

 

floor plan level 3 Liveris building

 

floor plan level 4 Liveris building

 

floor plan level 5 Liveris building

 

floor plan level 6 Liveris building

 

floor plan level 7 Liveris building

 

floor plan level 8 Liveris building

 

floor plan level 9 Liveris building

 

floor plan level 10 Liveris building

 

floor plan level 11 Liveris building

 

Construction progress

Thanks to a generous donation, the Andrew N. Liveris Building began construction in 2020 and is now complete. Follow the development of this incredible building.

Construction Update - August 2021

Construction Update - May 2021

Construction update - April 2021

Construction Update - November 2020

Construction update - December 2020

Artist impression design

Contact us

If you would like to be part of a legacy of sustainable innovation at UQ, a gift of any size will make an impact.

Give now